1. Attach the aditional pulley to pulley in power tiller.
2. Put the stand of water meter to the under of power tiller engine.
3. Fix the pump by bolt in the stand of water meter.
4. Install the streight line with power tiller pulley and water meter pulley.
5. Attach the absorbtion hose to pump absorbtion hall.
|